summaryrefslogtreecommitdiff
path: root/vendor/github.com/vishvananda
diff options
context:
space:
mode:
authorChris Evich <cevich@redhat.com>2020-01-29 15:38:51 -0500
committerChris Evich <cevich@redhat.com>2020-01-29 15:48:35 -0500
commit12bd7e927cc8b01033f6a9594ccdf0611f96e075 (patch)
treef2e0997e31569bd0a3f228a887fa07b0ecae105d /vendor/github.com/vishvananda
parentb2ae45cda18a9615c4ce61425531ce2c911701dc (diff)
downloadpodman-12bd7e927cc8b01033f6a9594ccdf0611f96e075.tar.gz
podman-12bd7e927cc8b01033f6a9594ccdf0611f96e075.tar.bz2
podman-12bd7e927cc8b01033f6a9594ccdf0611f96e075.zip
Cirrus: Set EPOCH_TEST_COMMIT during gate task
For whatever reason, this required variable is not set when `make` is doing validation within automation. Fix this by establishing the value based on data provided from the CI system. Since this data is specific to automation executing against a PR, limit this specific job to not run during testing of branches (post-merge). This is safe since we can assume the PR would not have been merged, if the basics checked during gating did not pass. Signed-off-by: Chris Evich <cevich@redhat.com>
Diffstat (limited to 'vendor/github.com/vishvananda')
0 files changed, 0 insertions, 0 deletions