aboutsummaryrefslogtreecommitdiff
path: root/test/e2e/libpod_suite_varlink_test.go
Commit message (Collapse)AuthorAge
* Fix up attach tests for podman remoteDaniel J Walsh2020-09-22
| | | | | | | | | | | When we execute podman-remote attach, we were not checking if the container was in the correct state, this is leading to timeouts and we had turned off remote testing. Also added an IfRemote() function so we can turn on more tests when using the "-l" flag for local, but use container name for remote. Signed-off-by: Daniel J Walsh <dwalsh@redhat.com>
* Switch all references to github.com/containers/libpod -> podmanDaniel J Walsh2020-07-28
| | | | Signed-off-by: Daniel J Walsh <dwalsh@redhat.com>
* move go module to v2Valentin Rothberg2020-07-06
| | | | | | | | | | | | | | | With the advent of Podman 2.0.0 we crossed the magical barrier of go modules. While we were able to continue importing all packages inside of the project, the project could not be vendored anymore from the outside. Move the go module to new major version and change all imports to `github.com/containers/libpod/v2`. The renaming of the imports was done via `gomove` [1]. [1] https://github.com/KSubedi/gomove Signed-off-by: Valentin Rothberg <rothberg@redhat.com>
* Attempt to turn on build_without_cgo testsDaniel J Walsh2020-05-22
| | | | Signed-off-by: Daniel J Walsh <dwalsh@redhat.com>
* v2 enable remote integration testsBrent Baude2020-05-19
enable remote integration tests Signed-off-by: Brent Baude <bbaude@redhat.com>